approximately 3 kilometers from the Olombendo FPSO. The early production of the development, that will increase and sustain the Olombendo FPSO production plateau, includes an oil producer well and a water injection well, tied back subsea to the existing Cabaça North subsea production system, thus exploiting the full potential of available infrastructures in the area, ENI said.
https://www.neweurope.eu/article/italys-eni-starts-production-of-the-cuica-field-offshore-angola/